Select major projects from the past 5 years (2018 - 2023)
Over the years, we have been privileged to be involved in some major and key projects throughout Zimbabwe. Do take note that when we were working on the projects listed below, we had other ones of varying sizes going on at the same times.
2018 - current
N. Richards
Work on retail, liquor and wholesale branches throughout Zimbabwe, including the following greenfield projects;
* Head office in Borrowdale, Harare
* Tynwald (Harare)
* Graniteside (Harare)
* Hatcliffe (Harare)
2018 - 2019
American Embassy @ Harare
CAT6 ethernet wiring for the LAN at the newly completed embassy complex in Westgate, Harare.
2019
CIMAS
Structured cabling throughout the new CIMAS head office at the Borrowdale Office Park in Harare.
2020 - 2021
Zimparks
Supply and installation of a Digital Mobile Radio network for the Lower Zambezi Valley area which consists at least three national parks.
Repeater units installed and Chemakunguwo mountain, Mana Pools office and Kariba Heights.
2021
Chinhoyi Municipality
Repair and replacement of radio units at various council properties throughout the city; five lattice masts were tensioned, repainted and some 3m sections were replaced.
The five main sites that were attended to are, Town House, Chikonohono, Engineering Depot, Gadzema and Waterworks.
2022
Plan INTERNATIONAL
Design, supply and installation of local area network from scratch at the newly-built head office located in Milton Park, Harare.
This also included assistance with business continuity and relocation from the previous rented office which was less than half a kilometre up the street.
2022 - ongoing
* (Ongoing as of May 2024)
Irvines
Network design and implementation of mainly the installation, repair and replacement of fibre optic backbones at both Derbyshire and Lanark farms.
Also advising client on the ideal network architecture (which includes proposing the right active hardware) that delivers an uninterrupted and efficient network.
2023
UNICEF Zimbabwe
Upgraded the whole network by replacing all CAT5 ethernet cabling with 20 000 metres of CAT6A. Existing fibre backbones were also taken out, replaced and new inter-department connections were added to the network.